Skip to main content

Dormitory Renovations, Alcorn State University

Cost of $7.3M – Estimated Completion – 8/30/2025

Robinson HallRobinson Hall will receive significant renovations on building structural envelope, masonry tuckpointing and waterproofing, replace or repairs to roofing, windows, ceiling, walls and flooring, heating/ventilation/air-conditioning (HVAC), electrical, and sitework grading. Upgrade lighting, plumbing, stalls, laundry Room (basement). Repair or replace interior walls, ceiling, door frames, and doors. Repair as required interior painting or staining. Updates to closet side panels as needed, replacement of existing resident room windows, replacement or upgrade of fire sprinkler system.

ASU – 101-328

  • Visit the IHL LinkedIn page
  • Visit the IHL YouTube page